Regulation (EC) No. 715/2009

According to Regulation (EC) No. 715/2009 of European Parliament and the Council on conditions for access to the natural gas transmission networks, and particularly to the Chapter 3 of Annex I of 10 November 2010 (2010/685/EU), the European transmission system operators are bound to publish several updated information in a prevalent format on their websites regularly.

In the following table you will find an overview of the implemented transparency requirements (first column) and where you will find the associated information linked to our website (second column). Further individual information about the requirements, e.g. exceptions, definitions, country/TSO specific interpretations, may be given as well (third column).

Annex I to Regulation (EC) 715/2009 Link Further Information
3.1.2 a)

A detailed and comprehensive description of the different services and their charges

3.1.2 b) u. c) 1.

Different transportation contracts and other significant documents

3.1.2 c)

Network code / standard conditions

3.1.2 c) 2.

Specification of relevant gas quality parameters

3.1.2 c) 3.

Pressure requirements

3.1.2 c) 4.

Procedure in the event of an interruption of interruptible capacity

3.1.2 d)

Harmonised procedures applied when using the transmission system, including the definition of key terms

3.1.2 e)

Provisions on capacity allocation, congestion management and anti-hoarding and reutilisation procedures

3.1.2 f)

Rules applicable for capacity trade on the secondary market vis-à-vis the transmission system operator

3.1.2 g)

Rules on balancing and methodology for the calculation of imbalance charges

3.1.2 h)

Flexibility and tolerance levels included in transportation and with additional charges

3.1.2 i)

Detailed description of the gas system of TSO and its relevant points of interconnection / names of the operators of the interconnected systems or facilities

3.1.2 j)

Rules applicable for connection to the system

3.1.2 k)

Information on emergency mechanisms

3.1.2 l)

Procedures agreed at interconnection points (if relevant) relating to interoperability of the network, agreed procedures on nomination and matching procedures and other agreed procedures that set out provisions in relation to gas flow allocations and balancing

3.1.2 m)

Description of the methodology and process used to calculate the technical capacity

3.3.(1) a-e, 3.3.(2), 3.3.(3)
3.3. (4), (5)

Capacities, nominations and renominations, actual physical flows, gross calorific values

3.3. (1) f)

Planned and actual interruptions

3.3. (1) g)

Planned and unscheduled interruptions

3.4 (1) u. (2)

Information on secondary trading

3.4 (3)

Balancing services

3.4 (4)

Further flexibility service of TSO; here OFC

3.4 (5)

Amount of gas in the transmission system and the forecast

3.4 (6)

User-friendly instruments for calculating tariffs