The table below shows maintenance work which may lead to capacity reductions. GRTgaz Deutschland will inform the concerned shippers about flow reductions or interruption in due time.
- Entry/Exit point:
- IP OBERKAPPEL ENTRY, IP OBERKAPPEL EXIT
- Scheduled Dates:
- 14.03.2016 - 08:00 to 18.03.2016 - 16:00
- Scheduled Works:
- Performance test at the compressor station Wildenranna.
- Effect on capacity:
- Entry and Exit gas transportation may be restricted. Interruptible and firm capacities may be affected.
- Last Update:
- 23.09.2016 - 15:40
- Entry/Exit point:
- IP MEDELSHEIM EXIT
- Scheduled Dates:
- 03.05.2016 - 18:00 to 04.05.2016 - 16:00
- Scheduled Works:
- Piping works at the compressor station Mittelbrunn.
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected. Low probability of interruption of firm capacity (maximum restriction of 2,4 GWh/h).
- Last Update:
- 23.09.2016 - 15:39
- Entry/Exit point:
- IP MEDELSHEIM EXIT
- Scheduled Dates:
- 30.05.2016 - 08:00 to 27.06.2016 - 16:00
- Scheduled Works:
- Works at the compressor station Mittelbrunn.
- Effect on capacity:
- Gas transportation may be restricted. Interruptible and firm capacities may be affected
- Last Update:
- 23.09.2016 - 15:38
- Entry/Exit point:
- IP OBERKAPPEL ENTRY, IP OBERKAPPEL EXIT
- Scheduled Dates:
- 01.06.2016 - 06:00 to 02.06.2016 - 18:00
- Scheduled Works:
- Works at the compressor station Wildenranna.
- Effect on capacity:
- High probability of restriction of Interruptible and firm capacities.
- Last Update:
- 23.09.2016 - 15:37
- Entry/Exit point:
- IP OBERKAPPEL ENTRY, IP OBERKAPPEL EXIT
- Scheduled Dates:
- 06.06.2016 - 08:00 to 24.06.2016 - 16:00
- Scheduled Works:
- Preparation works in the pipeline system.
- Effect on capacity:
- Gas transportation may be affected. Firm and interruptible capacities may be affected.
- Last Update:
- 23.09.2016 - 15:36
- Entry/Exit point:
- IP OBERKAPPEL ENTRY, IP WAIDHAUS ENTRY
- Scheduled Dates:
- 13.06.2016 - 08:00 to 17.06.2016 - 16:00
- Scheduled Works:
- Desinstallation works at the compressor station Wildenranna.
- Effect on capacity:
- No transport is planned during this period.
- Last Update:
- 23.09.2016 - 15:35
- Entry/Exit point:
- IP OBERKAPPEL ENTRY, IP OBERKAPPEL EXIT
- Scheduled Dates:
- 15.06.2016 - 08:00 to 16.06.2016 - 16:00
- Scheduled Works:
- Emergency Shutdown Test at the station Rothenstadt.
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected.
- Last Update:
- 23.09.2016 - 15:33
- Entry/Exit point:
- IP MEDELSHEIM EXIT
- Scheduled Dates:
- 20.06.2016 - 08:00 to 27.06.2016 - 16:00
- Scheduled Works:
- Works at the compressor station Mittelbrunn.
- Effect on capacity:
- Gas transportation may be restricted. Interruptible and firm capacities may be affected
- Last Update:
- 23.09.2016 - 15:31
- Entry/Exit point:
- IP WAIDHAUS ENTRY, IP WAIDHAUS EXIT
- Scheduled Dates:
- 20.06.2016 - 08:00 to 05.08.2016 - 16:00
- Scheduled Works:
- Maintenance works at the station Waidhaus.
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected.
- Last Update:
- 23.09.2016 - 15:30
- Entry/Exit point:
- IP GERNSHEIM ENTRY, IP GERNSHEIM EXIT
- Scheduled Dates:
- 13.07.2016 - 06:00 to 14.07.2016 - 06:00
- Scheduled Works:
- Emergency Shutdown Test at the station Gernsheim
- Effect on capacity:
- Gas transportation may be restricted. Interruptible and firm capacities may be affected
- Last Update:
- 23.09.2016 - 15:28
- Entry/Exit point:
- IP WAIDHAUS ENTRY, IP WAIDHAUS EXIT
- Scheduled Dates:
- 08.08.2016 - 08:00 to 18.11.2016 - 16:00
- Scheduled Works:
- Maintenance works at the station Waidhaus.
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected.
- Last Update:
- 23.09.2016 - 15:26
- Entry/Exit point:
- IP OBERKAPPEL ENTRY, IP OBERKAPPEL EXIT
- Scheduled Dates:
- 22.08.2016 - 06:00 to 26.08.2016 - 18:00
- Scheduled Works:
- Performance test at the compressor station Wildenranna.
- Effect on capacity:
- Gas transportation may be restricted. Interruptible and firm capacities may be affected
- Last Update:
- 23.09.2016 - 15:25
- Entry/Exit point:
- IP OBERKAPPEL ENTRY, IP OBERKAPPEL EXIT
- Scheduled Dates:
- 05.09.2016 - 08:00 to 16.09.2016 - 18:00
- Scheduled Works:
- Pipeline works.
- Effect on capacity:
- Gas transportation may be affected. Firm and interruptible capacities may be affected.
- Last Update:
- 23.09.2016 - 15:24
- Entry/Exit point:
- IP OBERKAPPEL ENTRY, IP OBERKAPPEL EXIT
- Scheduled Dates:
- 26.09.2016 - 08:00 to 27.09.2016 - 16:00
- Scheduled Works:
- Emergency Shutdown Test at the station Schwandorf.
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected.
- Last Update:
- 23.09.2016 - 15:23
- Entry/Exit point:
- IP WAIDHAUS ENTRY, IP WAIDHAUS EXIT
- Scheduled Dates:
- 28.09.2016 - 08:00 to 29.09.2016 - 18:00
- Scheduled Works:
- Yearly security check at the station Waidhaus.
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected.
- Last Update:
- 23.09.2016 - 15:22
- Entry/Exit point:
- IP MEDELSHEIM EXIT
- Scheduled Dates:
- 01.12.2016 - 06:00 to 01.03.2017 - 06:00
- Scheduled Works:
- Works at a compressor station in the NCG zone.
- Effect on capacity:
- High probability of restriction of Interruptible capacities. Probability of interruption of firm capacity (maximum restriction of 464 MWh/h).
- Last Update:
- 01.11.2016 - 13:53
- Entry/Exit point:
- IP MEDELSHEIM EXIT
- Scheduled Dates:
- 01.12.2016 - 08:00 to 16.12.2016 - 16:00
- Scheduled Works:
- Unplanned maintenance works at the station Mittelbrunn
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected.
- Last Update:
- 01.12.2016 - 15:11
- Entry/Exit point:
- IP MEDELSHEIM EXIT, IP WAIDHAUS ENTRY
- Scheduled Dates:
- 07.12.2016 - 06:00 to 07.12.2016 - 20:00
- Scheduled Works:
- Maintenance works at the station Gernsheim
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected
- Last Update:
- 28.11.2016 - 10:44
- Entry/Exit point:
- IP MEDELSHEIM EXIT, IP WAIDHAUS ENTRY
- Scheduled Dates:
- 12.12.2016 - 08:00 to 13.12.2016 - 16:00
- Scheduled Works:
- Maintenance works at the station Gernsheim
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected.
- Last Update:
- 28.11.2016 - 10:44
- Entry/Exit point:
- IP MEDELSHEIM EXIT
- Scheduled Dates:
- 06.06.2017 - 06:00 to 05.07.2017 - 06:00
- Scheduled Works:
- Project of the national Gas Network Development Plan (NEP) to reverse the compressor station in Waidhaus.
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected.
- Last Update:
- 06.02.2017 - 15:33
- Entry/Exit point:
- IP WAIDHAUS ENTRY, IP WAIDHAUS EXIT
- Scheduled Dates:
- 06.06.2017 - 06:00 to 05.07.2017 - 06:00
- Scheduled Works:
- Project of the national Gas Network Development Plan (NEP) to reverse the compressor station in Waidhaus.
- Effect on capacity:
- Entry and Exit gas transportation may be restricted. Interruptible and firm capacities may be affected.
- Last Update:
- 06.02.2017 - 15:33
- Entry/Exit point:
- IP WAIDHAUS ENTRY, IP WAIDHAUS EXIT
- Scheduled Dates:
- 05.07.2017 - 06:00 to 18.08.2017 - 06:00
- Scheduled Works:
- Project of the national Gas Network Development Plan (NEP) to reverse the compressor station in Waidhaus.
- Effect on capacity:
- Entry and Exit gas transportation may be restricted. Firm and interruptible capacities may be affected.
- Last Update:
- 10.04.2017 - 15:29
- Entry/Exit point:
- IP OBERKAPPEL ENTRY, IP OBERKAPPEL EXIT, IP WAIDHAUS ENTRY
- Scheduled Dates:
- 17.07.2017 - 06:00 to 12.08.2017 - 06:00
- Scheduled Works:
- Project of the national Gas Network Development Plan (NEP) - New station in Rothenstadt.
- Effect on capacity:
- Gas transportation may be restricted. Firm and interruptible capacities may be affected.
- Last Update:
- 06.06.2017 - 09:12
- Entry/Exit point:
- IP MEDELSHEIM EXIT
- Scheduled Dates:
- 28.08.2017 - 06:00 to 02.09.2017 - 06:00
- Scheduled Works:
- Maintenance works at MEGAL station Gernsheim
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected.
- Last Update:
- 20.06.2017 - 14:34
- Entry/Exit point:
- IP GERNSHEIM ENTRY, IP GERNSHEIM EXIT
- Scheduled Dates:
- 28.08.2017 - 06:00 to 02.09.2017 - 06:00
- Scheduled Works:
- Maintenance works at MEGAL station Gernsheim
- Effect on capacity:
- Gas transportation may be restricted. Interruptible and firm capacities may be affected.
- Last Update:
- 20.06.2017 - 11:20
- Entry/Exit point:
- IP MEDELSHEIM EXIT
- Scheduled Dates:
- 04.09.2017 - 06:00 to 09.09.2017 - 06:00
- Scheduled Works:
- Maintenance works at MEGAL station Gernsheim
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected.
- Last Update:
- 06.02.2017 - 15:19
- Entry/Exit point:
- IP GERNSHEIM ENTRY, IP GERNSHEIM EXIT
- Scheduled Dates:
- 04.09.2017 - 06:00 to 09.09.2017 - 06:00
- Scheduled Works:
- Maintenance works at MEGAL station Gernsheim
- Effect on capacity:
- Gas transportation may be restricted. Interruptible and firm capacities may be affected.
- Last Update:
- 20.06.2017 - 11:21
- Entry/Exit point:
- IP OBERKAPPEL ENTRY, IP OBERKAPPEL EXIT
- Scheduled Dates:
- 15.11.2017 - 06:00 to 17.11.2017 - 06:00
- Scheduled Works:
- Emergency Test at the Rothenstadt station.
- Effect on capacity:
- Gas transportation may be restricted. Interruptible and firm capacities may be affected.
- Last Update:
- 12.10.2017 - 08:24
- Entry/Exit point:
- IP MEDELSHEIM EXIT
- Scheduled Dates:
- 07.02.2018 - 06:00 to 15.02.2018 - 06:00
- Scheduled Works:
- Unplanned maintenance works at the station Mittelbrunn
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected.
- Last Update:
- 08.02.2018 - 10:00
- Entry/Exit point:
- IP MEDELSHEIM ENTRY, IP MEDELSHEIM EXIT
- Scheduled Dates:
- 22.02.2018 - 08:00 to 03.03.2018 - 06:00
- Scheduled Works:
- Unplanned maintenance works at the station Gernsheim
- Effect on capacity:
- Gas transportation may be restricted. Firm and interruptible capacities may be affected (maximum restriction of 0,35 GWh/h of firm capacities).
- Last Update:
- 05.03.2018 - 14:09
- Entry/Exit point:
- IP MEDELSHEIM ENTRY, IP MEDELSHEIM EXIT, IP OBERKAPPEL ENTRY, IP WAIDHAUS ENTRY
- Scheduled Dates:
- 03.04.2018 - 08:00 to 27.04.2018 - 16:00
- Scheduled Works:
- Project of the national Gas Network Development Plan (NEP) - MEGAL station in Gernsheim
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected.
- Last Update:
- 11.01.2018 - 15:40
- Entry/Exit point:
- IP MEDELSHEIM EXIT
- Scheduled Dates:
- 09.07.2018 - 08:00 to 20.07.2018 - 16:00
- Scheduled Works:
- Project of the national Gas Network Development Plan (NEP) - MEGAL station in Mittelbrunn
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected.
- Last Update:
- 13.04.2018 - 11:23
- Entry/Exit point:
- IP WAIDHAUS ENTRY
- Scheduled Dates:
- 16.07.2018 - 06:00 to 28.07.2018 - 06:00
- Scheduled Works:
- Commissioning Test of reverse flow at the station MEGAL Waidhaus
- Effect on capacity:
- Gas transportation may be restricted. Firm and interruptible capacities may be affected. (maximum restriction of 8,6 GWh/h).
- Last Update:
- 17.07.2018 - 09:14
- Entry/Exit point:
- IP OBERKAPPEL EXIT, IP WAIDHAUS ENTRY, IP WAIDHAUS EXIT
- Scheduled Dates:
- 09.10.2018 - 08:00 to 11.10.2018 - 16:00
- Scheduled Works:
- Commissioning Test of reverse flow at the station MEGAL Waidhaus
- Effect on capacity:
- Gas transportation may be restricted. Firm and interruptible capacities may be affected. (maximum restriction of 8,6 GWh/h in Waidhaus Entry).
- Last Update:
- 09.10.2018 - 09:18
- Entry/Exit point:
- IP MEDELSHEIM ENTRY, IP MEDELSHEIM EXIT, VIP FRANCE - GERMANY EXIT, VIP FRANCE - GERMANY ENTRY
- Scheduled Dates:
- 18.03.2019 - 08:00 to 27.03.2019 - 16:00
- Scheduled Works:
- Inspection of a Pipeline at Mittelbrunn
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected.
- Last Update:
- 05.03.2019 - 11:01
- Entry/Exit point:
- IP OBERKAPPEL ENTRY, IP OBERKAPPEL EXIT
- Scheduled Dates:
- 15.04.2019 - 08:00 to 30.04.2019 - 16:00
- Scheduled Works:
- Maintenance works at the compressor station Rothenstadt
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected.
- Last Update:
- 19.03.2019 - 10:35
- Entry/Exit point:
- IP MEDELSHEIM ENTRY, IP MEDELSHEIM EXIT, IP OBERKAPPEL ENTRY, IP OBERKAPPEL EXIT, IP WAIDHAUS ENTRY, IP WAIDHAUS EXIT, VIP FRANCE - GERMANY EXIT, VIP FRANCE - GERMANY ENTRY
- Scheduled Dates:
- 23.04.2019 - 08:00 to 06.05.2019 - 16:00
- Scheduled Works:
- Project of the national Gas Network Development Plan (NEP) - Works at the compressor Station Gernsheim
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected.
- Last Update:
- 11.04.2019 - 10:52
- Entry/Exit point:
- IP MEDELSHEIM ENTRY, IP MEDELSHEIM EXIT, VIP FRANCE - GERMANY EXIT, VIP FRANCE - GERMANY ENTRY
- Scheduled Dates:
- 06.05.2019 - 08:00 to 07.06.2019 - 16:00
- Scheduled Works:
- Maintenance works at the compressor Station Mittelbrunn
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected.
- Last Update:
- 02.04.2019 - 14:55
- Entry/Exit point:
- IP OBERKAPPEL ENTRY, IP OBERKAPPEL EXIT
- Scheduled Dates:
- 20.05.2019 - 07:00 to 22.05.2019 - 17:00
- Scheduled Works:
- Maintenance at the compressor Station Amerdingen (Bayernets)
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected.
- Last Update:
- 01.04.2019 - 13:35
- Entry/Exit point:
- IP MEDELSHEIM ENTRY, IP MEDELSHEIM EXIT, IP OBERKAPPEL ENTRY, IP OBERKAPPEL EXIT, IP WAIDHAUS EXIT, VIP FRANCE - GERMANY EXIT, VIP FRANCE - GERMANY ENTRY
- Scheduled Dates:
- 20.05.2019 - 08:00 to 24.05.2019 - 16:00
- Scheduled Works:
- Maintenance works at the compressor station Werne (OGE)
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected.
- Last Update:
- 11.04.2019 - 11:30
- Entry/Exit point:
- IP OBERKAPPEL ENTRY, IP OBERKAPPEL EXIT
- Scheduled Dates:
- 20.05.2019 - 08:00 to 11.11.2019 - 16:00
- Scheduled Works:
- Project of the national Gas Network Development Plan (NEP) - Compressor station in Schnaitsee (Bayernets)
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected.
- Affected capacity:
- Interruptible capacities
- Last Update:
- 30.09.2019 - 11:08
- Entry/Exit point:
- IP OBERKAPPEL EXIT
- Scheduled Dates:
- 27.05.2019 - 06:00 to 15.06.2019 - 06:00
- Scheduled Works:
- Disconnection of old compressor station MEGAL Station Rothenstadt
- Effect on capacity:
- Gas transportation may be restricted. Firm and interruptible capacities may be affected. (Maximum restriction of 538.000 kWh/h)
- Last Update:
- 09.05.2019 - 10:55
- Entry/Exit point:
- IP WAIDHAUS ENTRY
- Scheduled Dates:
- 24.06.2019 - 08:00 to 26.07.2019 - 16:00
- Scheduled Works:
- Emergency test and exchange of valves on MEGAL Station Waidhaus (updated 23.05.2019)
- Effect on capacity:
- Gas transportation may be restricted. Firm and interruptible capacities may be affected. (maximum restriction of 6,8 GWh/h).
- Affected capacity:
- Firm capacities (6.8 GWh/h; 66 %) and interruptible capacities
- Last Update:
- 08.07.2019 - 14:41
- Entry/Exit point:
- IP MEDELSHEIM ENTRY, IP MEDELSHEIM EXIT, IP WAIDHAUS ENTRY, IP WAIDHAUS EXIT, VIP FRANCE - GERMANY EXIT, VIP FRANCE - GERMANY ENTRY
- Scheduled Dates:
- 22.07.2019 - 08:00 to 09.08.2019 - 16:00
- Scheduled Works:
- Maintenance works at the compressor Station of Rothenstadt
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected.
- Affected capacity:
- Interruptible capacities
- Last Update:
- 08.07.2019 - 17:28
- Entry/Exit point:
- IP MEDELSHEIM ENTRY, IP MEDELSHEIM EXIT, IP OBERKAPPEL ENTRY, IP OBERKAPPEL EXIT, IP WAIDHAUS ENTRY, IP WAIDHAUS EXIT, VIP FRANCE - GERMANY EXIT, VIP FRANCE - GERMANY ENTRY
- Scheduled Dates:
- 29.07.2019 - 06:00 to 11.08.2019 - 06:00
- Scheduled Works:
- Project of the national Gas Network Development Plan (NEP) - Works at the compressor Station Gernsheim
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected.
- Affected capacity:
- Interruptible capacities
- Last Update:
- 08.07.2019 - 17:28
- Entry/Exit point:
- IP OBERKAPPEL EXIT
- Scheduled Dates:
- 05.08.2019 - 08:00 to 25.08.2019 - 16:00
- Scheduled Works:
- Works at the OGE station in Amerdingen
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected.
- Affected capacity:
- Interruptible capacities
- Last Update:
- 24.07.2019 - 14:35
- Entry/Exit point:
- IP OBERKAPPEL EXIT
- Scheduled Dates:
- 26.08.2019 - 08:00 to 01.11.2019 - 16:00
- Scheduled Works:
- Works at the station Obermichelbach
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected.
- Affected capacity:
- Interruptible capacities
- Last Update:
- 30.09.2019 - 11:09
- Entry/Exit point:
- VIP FRANCE - GERMANY EXIT, VIP FRANCE - GERMANY ENTRY
- Scheduled Dates:
- 02.09.2019 - 06:00 to 28.09.2019 - 06:00
- Scheduled Works:
- Project of the national Gas Network Development Plan (NEP) - Works at the compressor Station Mittelbrunn
- Effect on capacity:
- Gas transportation may be restricted. Firm and interruptible capacities may be affected.
- Affected capacity:
- Firm capacities (4.26 GWh/h; 35.78 %) and interruptible capacities
- Last Update:
- 30.07.2019 - 12:07
- Entry/Exit point:
- IP MEDELSHEIM ENTRY, IP MEDELSHEIM EXIT
- Scheduled Dates:
- 02.09.2019 - 06:00 to 28.09.2019 - 06:00
- Scheduled Works:
- Project of the national Gas Network Development Plan (NEP) - Works at the compressor Station Mittelbrunn
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected.
- Affected capacity:
- Interruptible capacities
- Last Update:
- 30.07.2019 - 12:00
- Entry/Exit point:
- IP OBERKAPPEL EXIT
- Scheduled Dates:
- 17.09.2019 - 08:00 to 25.10.2019 - 16:00
- Scheduled Works:
- Maintenance works at OGE Network
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected.
- Affected capacity:
- Interruptible capacities
- Last Update:
- 15.10.2019 - 17:09
- Entry/Exit point:
- IP OBERKAPPEL EXIT
- Scheduled Dates:
- 19.11.2019 - 08:00 to 20.11.2019 - 16:00
- Scheduled Works:
- Maintenance works due to the repair of a defect valve
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected.
- Affected capacity:
- Interruptible capacities
- Last Update:
- 13.11.2019 - 13:25
- Entry/Exit point:
- IP OBERKAPPEL ENTRY
- Scheduled Dates:
- 03.12.2019 - 06:00 to 06.12.2019 - 06:00
- Scheduled Works:
- Maintenance works due to regular inspection.
- Effect on capacity:
- as transportation may be restricted. Firm and Interruptible capacities may be affected.
- Affected capacity:
- Firm capacities (1.43 GWh/h; 49 %) and interruptible capacities
- Last Update:
- 31.10.2019 - 18:18
- Entry/Exit point:
- IP OBERKAPPEL EXIT
- Scheduled Dates:
- 03.12.2019 - 06:00 to 06.12.2019 - 06:00
- Scheduled Works:
- Maintenance works due to regular inspection.
- Effect on capacity:
- Gas transportation may be restricted. Firm and interruptible capacities may be affected.
- Affected capacity:
- Firm capacities (0.48 GWh/h; 100 %) and interruptible capacities
- Last Update:
- 01.11.2019 - 11:21
- Entry/Exit point:
- IP MEDELSHEIM EXIT, VIP FRANCE - GERMANY EXIT, VIP FRANCE - GERMANY ENTRY
- Scheduled Dates:
- 17.01.2020 - 15:00 to 17.01.2020 - 15:00
- Scheduled Works:
- Planned maintenance work - Modification of station blowout system and Exchange of a valve at compressor station Rimpar
- Effect on capacity:
- Affected capacity:
- Interruptible capacities
- Last Update:
- 17.01.2020 - 15:04
- Entry/Exit point:
- IP MEDELSHEIM ENTRY, IP MEDELSHEIM EXIT, VIP FRANCE - GERMANY EXIT, VIP FRANCE - GERMANY ENTRY
- Scheduled Dates:
- 24.02.2020 - 06:00 to 29.02.2020 - 06:00
- Scheduled Works:
- Planned maintenance work at Mittelbrunn (compressor shutdown);
Free Capacities will not be marketed in this time range (merketing stop) - Effect on capacity:
- Affected capacity:
- Interruptible capacities
- Last Update:
- 13.02.2020 - 16:04
- Entry/Exit point:
- IP OBERKAPPEL EXIT
- Scheduled Dates:
- 20.04.2020 - 08:00 to 15.05.2020 - 16:00
- Scheduled Works:
- Exchange non return valve controller group 2 at compressor station Rothenstadt
- Effect on capacity:
- Affected capacity:
- Interruptible capacities
- Last Update:
- 11.05.2020 - 11:06
- Entry/Exit point:
- IP GERNSHEIM EXIT, IP MEDELSHEIM EXIT, IP OBERKAPPEL EXIT, IP WAIDHAUS EXIT, VIP FRANCE - GERMANY EXIT
- Scheduled Dates:
- 04.05.2020 - 06:00 to 08.05.2020 - 18:00
- Scheduled Works:
- Planned Maintenance at the station in Werne.
- Effect on capacity:
- Affected capacity:
- Interruptible capacities
- Last Update:
- 19.02.2020 - 16:27
- Entry/Exit point:
- IP OBERKAPPEL EXIT
- Scheduled Dates:
- 11.05.2020 - 08:00 to 15.05.2020 - 16:00
- Scheduled Works:
- Planned maintenance works in OGE network: Pigging of the pipeline 53 ( Arresting - Bierwang )
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected.
- Affected capacity:
- Interruptible capacities
- Last Update:
- 26.03.2020 - 13:03
- Entry/Exit point:
- IP WAIDHAUS EXIT
- Scheduled Dates:
- 25.05.2020 - 08:00 to 29.05.2020 - 16:00
- Scheduled Works:
- Planned maintenance works at OGE Network
- Effect on capacity:
- Affected capacity:
- Interruptible capacities
- Last Update:
- 18.02.2020 - 15:58
- Entry/Exit point:
- IP WAIDHAUS ENTRY
- Scheduled Dates:
- 25.05.2020 - 08:00 to 29.05.2020 - 16:00
- Scheduled Works:
- Planned maintenance works at OGE Network
- Effect on capacity:
- Gas transportation may be restricted. Firm and interruptible capacities may be affected.
- Affected capacity:
- Firm capacities (72 %) and interruptible capacities
- Last Update:
- 18.02.2020 - 15:47
- Entry/Exit point:
- IP OBERKAPPEL EXIT
- Scheduled Dates:
- 02.06.2020 - 08:00 to 06.07.2020 - 16:00
- Scheduled Works:
- Unplanned maintenance works at OGE Network
- Effect on capacity:
- Affected capacity:
- Interruptible capacities
- Last Update:
- 30.04.2020 - 14:59
- Entry/Exit point:
- IP MEDELSHEIM ENTRY, IP MEDELSHEIM EXIT, VIP FRANCE - GERMANY EXIT, VIP FRANCE - GERMANY ENTRY
- Scheduled Dates:
- 15.06.2020 - 08:00 to 31.07.2020 - 16:00
- Scheduled Works:
- Planned Maintenance at the compressor station MEGAL Mittelbrunn (NEP).
- Effect on capacity:
- Gas transportation may be restricted. Firm (only at VIP France Germany) and interruptible capacities may be affected.
- Affected capacity:
- Firm capacities (4.4 GWh/h) and interruptible capacities
- Last Update:
- 30.04.2020 - 14:51
- Entry/Exit point:
- IP OBERKAPPEL EXIT
- Scheduled Dates:
- 06.07.2020 - 08:00 to 03.08.2020 - 16:00
- Scheduled Works:
- Planned maintenance works at OGE Network
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected.
- Affected capacity:
- Interruptible capacities
- Last Update:
- 07.05.2020 - 14:49
- Entry/Exit point:
- IP OBERKAPPEL EXIT
- Scheduled Dates:
- 14.07.2020 - 08:00 to 16.07.2020 - 16:00
- Scheduled Works:
- Planned maintenance works in OGE network
- Effect on capacity:
- Gas transportation may be restricted. Firm and interruptible capacities may be affected.
- Affected capacity:
- Firm capacities (47 %) and interruptible capacities
- Last Update:
- 09.07.2020 - 14:30
- Entry/Exit point:
- IP OBERKAPPEL EXIT
- Scheduled Dates:
- 17.08.2020 - 08:00 to 27.08.2020 - 16:00
- Scheduled Works:
- Planned maintenance at compressor station Rothenstadt.
- Effect on capacity:
- Firm capacities are affected (0,137 GWh/h; 28,5%)
- Affected capacity:
- Firm capacities (0.137 GWh/h; 28.5 %) and interruptible capacities
- Last Update:
- 24.08.2020 - 16:29
- Entry/Exit point:
- IP WAIDHAUS ENTRY, IP WAIDHAUS EXIT
- Scheduled Dates:
- 21.09.2020 - 08:00 to 06.11.2020 - 16:00
- Scheduled Works:
- Planned Maintenance at the MEGAL compressor station in Waidhaus.
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected.
- Affected capacity:
- Interruptible capacities
- Last Update:
- 28.07.2020 - 10:24
- Entry/Exit point:
- IP OBERKAPPEL EXIT
- Scheduled Dates:
- 05.10.2020 - 08:00 to 17.10.2020 - 16:00
- Scheduled Works:
- Planned maintenance at OGE Network.
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected.
- Affected capacity:
- Interruptible capacities
- Last Update:
- 06.08.2020 - 14:09
- Entry/Exit point:
- IP MEDELSHEIM ENTRY, IP MEDELSHEIM EXIT, IP OBERKAPPEL ENTRY, IP OBERKAPPEL EXIT, IP WAIDHAUS EXIT, VIP FRANCE - GERMANY EXIT, VIP FRANCE - GERMANY ENTRY
- Scheduled Dates:
- 15.10.2020 - 08:00 to 13.11.2020 - 16:00
- Scheduled Works:
- Unplanned maintenance at compressor station MEGAL RIMPAR.
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected.
- Affected capacity:
- Interruptible capacities
- Last Update:
- 29.10.2020 - 10:26
- Entry/Exit point:
- IP OBERKAPPEL EXIT
- Scheduled Dates:
- 19.10.2020 - 08:00 to 23.10.2020 - 16:00
- Scheduled Works:
- Planned maintenance at OGE Network.
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected.
- Affected capacity:
- Interruptible capacities
- Last Update:
- 06.08.2020 - 14:23
- Entry/Exit point:
- IP OBERKAPPEL EXIT
- Scheduled Dates:
- 19.10.2020 - 08:00 to 24.10.2020 - 16:00
- Scheduled Works:
- Planned maintenance at OGE Network.
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected.
- Affected capacity:
- Interruptible capacities
- Last Update:
- 06.08.2020 - 14:17
- Entry/Exit point:
- IP OBERKAPPEL EXIT
- Scheduled Dates:
- 20.10.2020 - 08:00 to 22.10.2020 - 16:00
- Scheduled Works:
- Planned meintenance due to a valve function test at Leitung 52 ud Leitung 452.
- Effect on capacity:
- Only interruptible capacities are affected.
- Affected capacity:
- Firm capacities (0.292 GWh/h; 35.3 %) and interruptible capacities
- Last Update:
- 09.09.2020 - 15:49
- Entry/Exit point:
- IP OBERKAPPEL EXIT
- Scheduled Dates:
- 27.10.2020 - 08:00 to 29.10.2020 - 16:00
- Scheduled Works:
- Unplanned mainteneance due to pigging of Ltg. 26/401.
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected.
- Affected capacity:
- Interruptible capacities
- Last Update:
- 05.10.2020 - 10:30
- Entry/Exit point:
- IP MEDELSHEIM ENTRY, IP MEDELSHEIM EXIT, VIP FRANCE - GERMANY EXIT, VIP FRANCE - GERMANY ENTRY
- Scheduled Dates:
- 27.10.2020 - 08:00 to 28.10.2020 - 16:00
- Scheduled Works:
- Planned maintenance at IP Gernsheim due to a safety test with effect on IP Medelsheim and VIP France Germany.
- Effect on capacity:
- Only interrutible capacities are affected.
- Affected capacity:
- Interruptible capacities
- Last Update:
- 01.09.2020 - 15:54
- Entry/Exit point:
- IP GERNSHEIM ENTRY, IP GERNSHEIM EXIT
- Scheduled Dates:
- 27.10.2020 - 08:00 to 28.10.2020 - 16:00
- Scheduled Works:
- Planned maintenance due to a safety test.
- Effect on capacity:
- 100% of firm and interruptible capacities at IP Gernsheim Entry are affected.
100% of interruptible capacities at IP Gernsheim Exit are affected.
No capacities will be marketed at IP Gernsheim. - Affected capacity:
- Firm capacities (100 %) and interruptible capacities
- Last Update:
- 01.09.2020 - 15:44
- Entry/Exit point:
- IP OBERKAPPEL EXIT
- Scheduled Dates:
- 02.11.2020 - 08:00 to 06.11.2020 - 16:00
- Scheduled Works:
- Planned maintenance at OGE Network.
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected.
- Affected capacity:
- Interruptible capacities
- Last Update:
- 06.08.2020 - 14:29
- Entry/Exit point:
- IP OBERKAPPEL EXIT
- Scheduled Dates:
- 10.11.2020 - 08:00 to 11.11.2020 - 16:00
- Scheduled Works:
- Unplanned maintenance due to the pigging of Ltg. 26/401.
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected.
- Affected capacity:
- Interruptible capacities
- Last Update:
- 05.10.2020 - 10:34
- Entry/Exit point:
- IP WAIDHAUS ENTRY, IP WAIDHAUS EXIT
- Scheduled Dates:
- 18.11.2020 - 08:00 to 20.11.2020 - 16:00
- Scheduled Works:
- Emergency Shutdown Test at the station Waidhaus
- Effect on capacity:
- Gas transportation may be restricted. Interruptible capacities may be affected.
- Affected capacity:
- Interruptible capacities
- Last Update:
- 09.09.2020 - 15:50
The planned maintenance works are also available as xls files for the following years:
XLS file maintenance works 2017
XLS file maintenance works 2016
XLS file maintenance works 2015
XLS file maintenance works 2014
XLS file maintenance works 2013
XLS file maintenance works 2012